PRODUCTS CENTER
Prevent leakage pollution Geomembrane
Category:
Geomembrane
Phone:+86-18905485848
Product Description
Prevent leakage pollution Geomembrane
| Name; geomembrane |
| Length; 1-6m |
| Thickness; 0.3 -2 mm |
| Material; HDPE, LDPE, PVC, LLDPE |
| Color; Black, white, blue, customized products can be supported according to customer needs |

Geomembranes play an necessary position in civil engineering and environmental protection. The following are countless essential components of geomembranes: Geomembranes play an essential function in civil engineering and environmental protection, as they can stop soil erosion, stop leakage and pollution, toughen soil, and manage humidity. The use of geomembranes can enhance the nice and sustainability of engineering, guard the fitness of soil, water resources, and ecological environment.

![]() |
![]() |
![]() |
![]() |
![]() |
Preventing soil erosion: Geomembranes can successfully stop the erosion of soil via water glide and wind. It can structure a bodily barrier to stop soil particles from being washed away, thereby defending the best and steadiness of the soil.
Prevent leakage and pollution: Geomembranes typically have suitable anti-seepage performance, which can forestall liquids, gases, or pollution from infiltrating soil or groundwater. This is very essential for environmental safety and underground engineering, as it can stop pollution from harming water assets and ecosystems.
![]() |
![]() |
|
![]() |
![]() |
Strengthening soil: Geomembranes can be used to improve soil, enhance soil balance and bearing capacity. It can disperse hundreds and forestall soil contract and deformation. In civil engineering, geotextile membranes can be used to toughen roads, slope protection, financial institution protection, and reclamation projects.
Control soil moisture: Geomembranes can be used to manage soil moisture and moisture content. It can stop immoderate evaporation or leakage of water, keep appropriate humidity in the soil, and facilitate plant boom and irrigation of farmland.

Isolation function: Geomembranes can isolate soil layers with exquisite properties, prevent mixing between different soil layers, and make positive the zoning and layered use of the land.
Ensure engineering quality: The use of geomembranes can efficiently decorate the first-rate and stability of the project, guard the soil structure and infrastructure from damaging factors such as flooring expansion, settlement, erosion, and corrosion.
Promoting plant growth: Geomembranes can limit the evaporation and loss of soil moisture, furnish moisturizing and insulation effects, and furnish applicable environmental conditions for plant growth.

|
Properties |
Test Method |
GMSH050 |
GMSH075 |
GMSH100 |
GMSH150 |
GMSH200 |
|
■ Thickness |
ASTM D5199 |
0.50 mm |
0.75 mm |
1.00 mm |
1.50 mm |
2.00 mm |
|
■ Density |
ASTM D1505 |
0.940 g/cc |
0.940 g/cc |
0.940 g/cc |
0.940 g/cc |
0.940 g/cc |
|
Tensile Properties |
|
|
|
|
|
|
|
■ Yield strength ■ Break strength ■ Yield elongation ■ Break elongation |
ASTM D6693 Type IV
|
7 kN/m 13 kN/m 12% 700% |
11 kN/m 20 kN/m 12% 700% |
15 kN/m 27 kN/m 12% 700% |
22 kN/m 40 kN/m 12% 700% |
29 kN/m 53 kN/m 12% 700% |
|
■ Tear Resistance |
ASTM D1004 |
62 N |
93 N |
125 N |
187 N |
249 N |
|
■ Puncture Resistance |
ASTM D4833 |
160 N |
240 N |
320 N |
480 N |
640 N |
|
■ Stress Crack Resistance |
ASTM D5397 |
500 hrs |
500 hrs |
500 hrs |
500 hrs |
500 hrs |
|
■ Carbon Black Content |
ASTM D1603 |
2.0% |
2.0% |
2.0% |
2.0% |
2.0% |
|
■ Carbon Black Dispersion |
ASTM D5596 |
For 10 different views:9 in Categories 1 or 2 and 1 in Category 3 |
||||
|
■ Oxidative Induction Time (OIT) |
ASTM D3895 |
100 min. |
100 min. |
100 min. |
100 min. |
100 min. |
|
■ UV Resistance High Pressure OIT retained after 1600hrs |
ASTM D5885 |
50% |
50% |
50% |
50% |
50% |
|
Dimensions |
|
|
|
|
|
|
|
■ Roll Width (m) |
|
7 |
7 |
7 |
7 |
7 |
|
■ Roll Length (m) |
|
420 |
280 |
210 |
140 |
105 |

![]() |
![]() |

Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.

Applied to the projects of Landfill site, bank, dam, storage reservoir, channel, irrigation, highway, railway, tunnel, drinking tank, salt field bittern pan, chemical liquid storage, treatment tank, artificial lake and riverway etc.

GET A FREE QUOTE











