Drainage filtration PP Mining Geogrid

Classification :

keyword:

PP Mining Geogrid

PRODUCT DETAILS

During the construction process of PP mining geogrid, there are some precautions that need to be noted:

Before construction, on-site surveys should be conducted to understand the geological conditions, soil conditions, and surrounding environment of the construction site, in order to select suitable materials and construction plans.

The construction of grilles should comply with relevant standards and regulatory requirements, and the construction unit must have relevant construction qualifications and technical experience.

 

 

 

Before construction, a detailed construction plan and process should be developed, and relevant workers should be trained to ensure construction quality and safety.

During the construction process, attention should be paid to protecting the environment and avoiding pollution and damage to the surrounding environment.

The material selection of the grille should meet the engineering design requirements, and the quality and specifications of the materials should meet the standard requirements.

 

 

Before construction, the construction site should be leveled and debris and obstacles should be removed to ensure the smooth progress of the construction.

During the construction process, it is necessary to strictly follow the construction plan to avoid illegal operations and substandard construction quality.

After completion of construction, acceptance work should be carried out to ensure that the construction quality meets the design requirements and regulatory requirements.

 

 

After the construction is completed, the construction site should be cleaned up and debris and waste should be properly disposed of to avoid environmental pollution.

During the construction process, it is necessary to strengthen the safety management of the construction site to ensure the personal safety of workers and the safety of the construction site.

 

 

Properties

 

Item                    Spec

False Roof/Roadway Side Support

Roll Size(m)

0.5-6

Mesh Size(mm)

35x35   50x50   100x100

Longitudinal Tensile Strength≥(kN/m)

15-50

Transverse Tensile Strength≥(kN/m)

15-50

Resistance of the product’s surface<(Ω)

1.0x109

Flameless Combustion Time≤(s)

10

Width(m)

1-6

 

certificate

 

 

 

Factory Appearance

 

RELATED PRODUCTS


GET A FREE QUOTE