High Strength Polyester Customized Reinforcement Mining Geogrid
Classification :
keyword:
PP Mining Geogrid
PRODUCT DETAILS

![]() |
![]() |
![]() |
![]() |
![]() |

![]() |
![]() |
![]() |
![]() |
![]() |
One of the main uses of PP geogrid in mining is to construct tailings dams. Tailings dams are used to contain waste materials generated during mining processes, such as rock fragments and mud. These dams need stability and erosion resistance to prevent environmental pollution. PP geogrid is commonly used to reinforce the soil structure of these dams, providing additional strength and stability.
Another important application of PP geogrid in mining is slope stability. Due to the disturbance of natural landscapes during mining, the slopes in mining areas are often prone to erosion and landslides. By using PP geogrids to reinforce soil, miners can help prevent slope collapse and ensure the safety of workers and nearby communities.
In addition, PP geogrid can also be used for the construction of mine access roads and platforms. These roads and platforms need to withstand heavy loads from mining equipment and vehicles, as well as harsh weather conditions. By incorporating PP geogrids into the design, engineers can improve the soil's bearing capacity and extend the lifespan of these critical infrastructure components.
Overall, the use of PP geogrid in mining applications demonstrates innovative methods of utilizing geosynthetic materials to improve mining efficiency and sustainability

|
Item Spec |
False Roof/Roadway Side Support |
|
Roll Size(m) |
0.5-6 |
|
Mesh Size(mm) |
35x35 50x50 100x100 |
|
Longitudinal Tensile Strength≥(kN/m) |
15-50 |
|
Transverse Tensile Strength≥(kN/m) |
15-50 |
|
Resistance of the product’s surface<(Ω) |
1.0x109 |
|
Flameless Combustion Time≤(s) |
10 |
|
Width(m) |
1-6 |

![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |

Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.


Factory Appearance

RELATED PRODUCTS
GET A FREE QUOTE



















