Mountain reinforcement PP Triaxial Geogrid
Classification :
keyword:
PP Triaxial Geogrid
PRODUCT DETAILS

Three directional geogrid is a typically used geotechnical fabric in engineering initiatives such as soil and rock slopes, river financial institution slopes, and airport runways. It is composed of intersecting fiber bundles and connecting nodes, with appropriate tensile power and shear resistance.
![]() |
![]() |
![]() |
![]() |
Cleaning the foundation: Before laying the three-d geogrid, it is quintessential to handy the basis of the improvement area. Remove soil, weeds, stones, and one of a sort particles from the ground of the base to make certain that it is flat, dry, and solid.
Laying three-way geogrid: According to the plan requirements, lay the three-way geogrid perpendicular to the slope ground or monetary employer slope direction. According to the unique setting up situation, two strategies of laying can be used: rolling and palletizing. During the laying process, it is quintessential to make superb that the fiber bundles of the three-d geogrid can be firmly embedded in the soil and definitely contact the base.


![]() |
![]() |
![]() |
![]() |
Fixed three-way geogrid: After laying, it ought to be regular in a well timed manner. Usually, U-shaped nails or anchor rods can be used to fix the three-d geogrid to the foundation. The function and spacing of constant factors ought to be geared up in accordance to unique shape necessities to make fantastic the steadiness and reliability of the third-dimensional geogrid.
Inspection and repair: After fixation is completed, an inspection ought to be carried out to make positive that the laying and fixing quality of the three-way geogrid meets the requirements. If any damage or defects are found, they ought to be repaired or modified in a exact timed manner.
The above are the laying steps of the three-way geogrid, on the different hand the one of a kind improvement approach can additionally in addition range relying on the project. Before construction, please refer to applicable graph specs and technical requirements, and comply with the training of expert personnel for operation.

|
Item |
Test Method |
Unit |
Standard |
|
Polymer |
- |
PP |
|
|
Rib Middle Distance |
- |
mm |
35 |
|
Minimum Carbon Black |
ASTM D 4218 |
% |
2 |
|
Radial Secant Stiffness at 2% Strain |
ASTM D 6637 |
kN/m |
225 |
|
Elongation |
ASTM D 6637 |
% |
13 |
|
Junction Efficiency |
GRI GG2 |
% |
96 |
|
Experimental Conditions |
Temperature: 20℃ |
||
|
Roll Width |
- |
m |
3.95 |
|
Roll Length |
- |
m |
50 |
Note: MD = Machine Direction; TD = Transverse Direction.

![]() |
![]() |
![]() |
![]() |
In short, three-way geogrid has wide application value in soil engineering, which can improve the shear strength of soil, increase the load-bearing capacity of soil, and prevent soil erosion and loss.

Q: What can you buy from us?
A: Geomembrane,Geogrid,Geocell, Geotextile, Geocomposite,
Q: Can I have a sample?
A: Yes. And sample free.
Q: What's the payment terms?
A: T/T or L/C. Others could be negotiated.
Q: What's the delivery time?
A: 3-20 days after confirming order, detail delivery date should be decided according to production season and order quantity.

Factory Appearance

RELATED PRODUCTS
GET A FREE QUOTE










